Saturday 26 March 2011

Construction- day 1

Today's attendees:
All of our group!

Today we conducted our indoor shots, at matt's house. Sophie (our actress) Fitted her costume perfectly and even though She was nervous, she was extremely easy to direct and worked really hard.

I was artistic director on set today and told sophie where to stand and positioning in the frame, I also told her what her motivation was and help her act the scene out. Sam was on continuity and clapperboard. Holly operated the camera. Matt was directing, telling us what shots to use and kept everything running as smoothly as possible.

The main issues we had today were problems with natural lighting continuity and the tight space of the bathroom, which made it really hard to pan. But after 7 takes we finally got a perfect shot. We may have to sort the lighting continuity in final cut studio, using exposure, brightness, contrast.

No comments: